Loading the load carrier system
IntroductionTurn signal and main beam lever
Fig. 67 Turn signal and main beam lever
First read and observe the introductory information
and safety warnings
Move the turn signal and main beam lever to the desired position:
Right turn signal . When the ignition is
switched off, right parking light .
Left turn signal . When the ...
Introduction
This chapter contains information on the following subjects:
→ Ignition lock
→ Starting the engine
→ Stopping the engine
→ Electronic immobilizer
Notes in this chapter concerning the automatic gearbox are applicable
both for the automatic gearbo ...
Paint Thickness Tester -VAS6197
Definition:
Paint Thickness Tester -VAS6197-
Product Description
Fully-electronic layer thickness measuring instrument with 2
independently operating sensors and LCD screens. Measurements on
...