Snow chains
IntroductionPositive and earth jump lead connection points
Fig. 190 In the engine
compartment: jump lead connection point, positive ⊕
First read and observe the introductory
information and safety warnings
The positive jump lead connection point is in the engine compartment. In
order to establish a suitable earth connection, screw towing eye into ...
Aquaplus Design and Multi-Color Paintwork
In order to achieve error-free design and multi-colored
paint applications using Aquaplus solid, metallic, pearlescent
base paint, pay attention to the important notes and in some
cases use special tools.
Preparation:
...
Wire Break with Dual Repair Point
Repair point with intermediate wire section
–
Free up wire intended for repair at two points
(approximately 20 cm to both sides of respective repair points).
–
If required, remove wiring harness wra ...