Volkswagen Polo Service & Repair Manual: Two-Part Steel Filling Paste Set
| Two-Part Steel Filling Paste Set -DA 787 300 A2- |
| This filling paste is made of polyester and a metal powder
mixture and is used to produce true-to-contour surfaces on
highly stressed body surfaces. This filling paste works
especially well as a replacement for lead-coated alluvial tin. |
| This filling paste is pliable and sandable while maintaining
a high degree of firmness and temperature stability, which makes
it especially suitable to be painted over. |
Note
| The Two-Part Hardener, Long -LVM 018 100 A2- must be used at
temperatures over 30 °C (86 °F) and / or with a relative
humidity over 80 %. |
| General metallic base surfaces |
|
|
|
| Pre-treatment of base surfaces: |
| – |
Carefully remove any grease and sand the base surface. The
base surfaces must be prepared using the
→ Chapter „Pneumatic Brush Grinder Set -VAS6446-“.
This means down to the bare metal with P40 grit sandpaper. If
necessary, clean the dirty surface once again and then remove
any cleaning residue again using the brush grinder. |
|
|
|
| – |
Clean once more using silicone remover before reworking. |
|
|
|
| Application type: Filling |
|
|
|
| – |
Both components are mixed in a ratio of 1 part by volume of
hardener liquid and 2.5-3 parts by volume of powder or 10 grams
of hardener liquid and 58 grams of powder to create a product
that can be spread. |
Note
| Avoid using too much hardener liquid, since this can
negatively affect the final strength and adhesion of the filling
paste. |
| – |
The pot life is approximately four to six minutes at +20 °C
(68 °F). |
| – |
The reaction temperature requires at least +5 °C (41 °F). |
|
|
|
| – |
Cure using the short-wave IR heater. |
| Ventilate approximately 10 minutes at +20 °C (68 °F). |
| Pre-hardening: 10 minutes at approximately 50 °C (122 °F) |
| Hardening 1st step: 10 minutes at 75 °C (167 °F) |
| Hardening 2nd step: 10 minutes at 85 °C (185 °F) |
|
|
|
| – |
Use the body planer to remove excess material before the
thermal final curing process. |
| – |
Then use P80 grit dry sandpaper to sand the contours. |
|
|
|
| Air Drying: |
Powder + Hardener Liquid |
|
| Flashpoint: |
Hardener |
33 °C (91.4 °F) |
| |
Powder |
not applicable |
| The guaranteed shelf life is 12 months from the production
date. Use no later than the date indicated on the label and
store in original container at +20 °C (68 °F). |
|
|
|
| – |
Store in a cool and dry place. Storage temperature +20 °C
(68 °F). |
Note
| Use only in well ventilated spaces. |
| The wearing of protective gloves and dust masks is
recommended. |
| The use of a grinding dust extractor is recommended. |
|
|
|
Definition:
Two-Part Fine Filling Paste -LSP 784 002 A2-
Edition 06/2011
Product Description
...
Other materials:
Changing bulbs in the side turn signals
Fig. 188 Removing the side turn
signal bulb
Fig. 189 Side turn signal:
changing the bulb
First read and observe the introductory
information and safety warnings
Depending on the vehicle, the side turn signal may be located in the front
wing or in the exterior mirror .
Please contact a ...
Diesel
First read and observe the introductory information
and safety warnings Diesel
Diesel fuel must comply with the European standard EN 590 (in Germany DIN EN
590) .
The service intervals are shorter if you use diesel with a high sulphur content
⇒ BookletService schedule, . A Volkswa ...
Long-Term Underbody Protection -D 314 D36 M2-, Gray
Definition:
Long-Term Underbody Protection -D 314 D36 M2-, Gray
Edition 02/2010
Product description of Long-Term Underbody Protection -D 314
D36 M2-, gray
Long-Term Underbody ...
© 2016-2026 Copyright www.vwpolo.net
