IntroductionChecklist
The following actions must always be carried out in the given
order in preparation for filling a tyre :
If you get a flat tyre, park your
vehicle on a firm and level surface at a safe distance from the flow of
traffic.
Apply the handbrake firmly Braking,
stopping and parking B ...
Wire Break with Single Repair Point
Repair point with single crimp connection
–
Free up wire intended for repair (approximately 20 cm to
both sides of repair point).
–
If required, remove wiring harness wrapping using a folding
...
Flat Connector Systems
Note
If necessary, housing securing mechanisms (secondary locks)
must be released or removed using specified tool before
releasing the contacts. Refer to
→ Chapter „Secondary Lock“.
...