|
|
Round Connector Systems
Note
If necessary, housing securing mechanisms (secondary locks)
must be released or removed using specified tool before
releasing the contacts. Refer to
→ Chapter „Secondary Lock“.
...
A/C Service Station, Connecting for Measuring and Testing
Caution
If it is suspected that chemicals were added to the
refrigerant circuit to seal leaks, do not connect the
A/C service station and do not extract the refrigerant.
...
AGM Battery, Checking
Perform Battery Checks in the Following Sequence:
1.
Visual inspection. Refer to
→ Chapter „Visual Inspection“.
2.
Check the battery using the Battery Tester -VAS6161-. Refer
to
...