IntroductionA/C Service Station, Emptying
Caution
If it is suspected that chemicals were added to the
refrigerant circuit to seal leaks, do not connect the
A/C service station and do not extract the refrigerant.
...
Two-Part Epoxy Primer Filler
Definition:
Two-Part Epoxy Primer Filler -LLS MAX 220 M1-, beige (250
ml)
Two-Part Epoxy Primer Filler -LLS MAX 220 M2-, beige (400
ml)
Edition 03/2013
Product De ...
Checking with Expansion Valve, Receiver/Dryer and A/C Compressor Regulator
Valve -N280-, Externally Regulated A/C Compressor
Specified Values
Note
Connecting service station. Refer to
→ Chapter „Connecting Service Station“.
Observe test requirements. Refer to
→ Chapter „P ...