Visual Inspection
3-Color Visual Indicator, CheckingRun-Flat System PAX, Support Ring
Dimensions
Overview of the most important dimensions:
Names
Example: 90-500(35) CLI A 1 876107
90 -
Designated width in millimeter ...
A/C Service Station, Emptying
Caution
If it is suspected that chemicals were added to the
refrigerant circuit to seal leaks, do not connect the
A/C service station and do not extract the refrigerant.
...
Charge Factor
A vessel must have space for vapor as well as liquid. As the
temperature rises, the liquid expands. The space filled with
vapor decreases. At a certain point, there will only be liquid
in the vessel. Beyond this, even a slight increase in
temperature cau ...