IntroductionFlat Connector Systems
Note
If necessary, housing securing mechanisms (secondary locks)
must be released or removed using specified tool before
releasing the contacts. Refer to
→ Chapter „Secondary Lock“.
...
Adhesive Surface Pretreatment when Replacing Laser-Soldered Roofs
Dry sand the cataphoretic primer on the roof adhesive surface
-item 6-
→ Item down to the bare metal using P180 sandpaper.
–
Dry sand the roof pillar adhesive surface
...
Positive and earth jump lead connection points
Fig. 190 In the engine
compartment: jump lead connection point, positive ⊕
First read and observe the introductory
information and safety warnings
The positive jump lead connection point is in the engine compartment. In
order to establish a suitable earth connection, screw towing eye into ...