Refrigerant Circuit Repair Information
Laws and RegulationsAdhesive Surface Pretreatment when Replacing Laser-Soldered Roofs
Dry sand the cataphoretic primer on the roof adhesive surface
-item 6-
→ Item down to the bare metal using P180 sandpaper.
–
Dry sand the roof pillar adhesive surface
...
Checking with Expansion Valve, Receiver/Dryer and A/C Compressor Regulator
Valve -N280-, Externally Regulated A/C Compressor
Specified Values
Note
Connecting service station. Refer to
→ Chapter „Connecting Service Station“.
Observe test requirements. Refer to
→ Chapter „P ...
Introduction
This chapter contains information on the following subjects:
→ Indicator lamps and fuel gauge
→ Filling the tank with petrol or diesel
→ Refuelling autogas
→ Capacities
→ Checks when filling the tank
The fuel cap is located at the re ...